| |  The purpose of the annual Street Maintenance Program is to improve the integrity and service life of the streets. Over the years, the combination of heavy traffic, water (through cracks), and the aging of the asphalt has contributed to the deterioration of some streets in Palo Alto. A pavement management system has been established to protect the City's investment in our 197+ mile street system. The goal of the City's pavement management system is to provide serviceable streets in the most cost-effective way possible. To accomplish this goal, the streets are surveyed, the information is combined with the data on the street's maintenance history, original design, and traffic uses, and then rated by a computerized Pavement Maintenance Management System (PMMS) in order to determine whether maintenance is needed and what type of resurfacing is appropriate. The annual project typically encompasses approximately 10 lane miles of asphalt concrete paving and approximately 30 lane miles of slurry sealing per year, with an annual average budget of $3.8 million. Please take a moment to call a staff member or to send us your comments via E-mail: pwecips@cityofpaloalto.org. A staff member will respond to any comments or suggestions submitted. | | Our Contact Numbers - Murdo Nicolson,
Project Engineer Technician, Engineering Division 650-617-3154 Email: Murdo Nicolson - Denis Huegle,
Inspector, Supervisor, Engineering Division 650-496-6929 Email: Denis Huegle Our Mailing Address - City of Palo Alto
Public Works Department Engineering Division 250 Hamilton Avenue, 6th Floor Palo Alto, CA 94301 | | | 2011 Annual Street Maintenance Program [more] |
| Maintenance and resurfacing work descriptions for the annual Street Maintenance Program Project. The City currently utilizes six unique approaches for preventative maintenance and resurfacing. [more] |
|
|
|
|
| | |
City of Palo Alto City Hall - 250 Hamilton Ave, Palo Alto, CA 94301 | Main Telephone Number 650-329-2100 8am-5pm M-Th, Alt Fridays |
| |
| |
|